Steel fabrication Send your drawings. Get a price range in 24 hours.

Steel structures, pre-engineered buildings and custom steelwork, fabricated at certified partner shops in Turkey and shipped as a marked kit. Firm quote follows in 2–3 business days.

  • Certified partner shops in Turkey
  • Piece-marked kit with erection drawings
  • EN 10204 3.1 certificates on request

Drop files here, or browse

PDF, DWG, DXF, IFC, STEP, Excel/CSV or photos · up to 10 files, 100 MB

No drawings? Upload photos, sketches or a list with dimensions.

Steel type

We reply within 24 hours on business days. Your files are used only to prepare your quote.

How it works

  1. 01

    Upload

    Drawings, a model, photos or a dimension list.

  2. 02

    Price range in 24 hours

    A budget range for the job, and the lead time.

  3. 03

    Firm quote in 2–3 business days

    Once the scope is confirmed.

  4. 04

    Your order

    Approve the quote and we confirm your order. Fabrication starts once the order is confirmed.

  5. 05

    Fabrication and shipment

    Shipped as a piece-marked kit with a packing list. Your team erects on site.

In the workshop

Cutting, welding, assembly, coating and checks before the steel leaves for site.

Fabrication hall with an overhead crane
CNC cutting table cutting a steel plate
Welding a steel frame
Grinding a weld seam
Welded box-section steel assembly
Welded lugs and pin joints on a heavy frame
Bolted splice inside a steel box girder
Measuring coating thickness
Painted steel frames lifted for dispatch

What ships in a kit

A complete steel package, marked for erection — not loose profiles.

Fabricated steel loaded on a flatbed trailer
  1. 01

    Primary frames — welded built-up or hot-rolled sections

  2. 02

    Purlins, girts, and secondary members

  3. 03

    Bracing, connection plates, and a matching bolt set

  4. 04

    Piece marks and a packing list for unloading

  5. 05

    Erection drawings for your crew

  6. 06

    Optional cladding: trapezoidal sheet or sandwich panel

Included

  • Takeoff from your dimensions or submitted drawings, and a clear fabrication scope — not structural design or permit drawings
  • Cutting, drilling, and welding to the agreed specification
  • Shop primer or the coating stated on the quote
  • Piece marking, packing list, and erection drawings
  • Bolt and plate sets for the steel kit
  • Mill certificates (EN 10204 3.1) on request

Not included

  • Site erection and supervision
  • Foundations, slabs, and civil works
  • Local building permits and design liability in your country
  • Site erection cranes, site labour, and installation tools

Questions buyers ask first

Do you erect the building?
No. We supply a marked steel kit. Your crew — or a local erector — assembles it. Foundations and permits stay with you.
Can you give an instant price like some US kit sites?
Not honestly. Snow, wind, crane loads and cladding change the steel. Send your drawings: Price range in 24 hours. Firm quote in 2–3 business days.
Are these pre-engineered (PEB) buildings?
Yes, in the practical sense: each building is engineered for the span, length, loads and openings you send, then fabricated and shipped as a bolted kit. It is not a stock catalogue — typical halls are only a starting point.
What about CE / EN 1090 for Europe?
Structural kits destined for Europe are placed with EN 1090-capable partner shops. Mill certificates (EN 10204 3.1) are available on request.
Is the 24-hour price final?
No. It is a budget range to help you decide. The firm quote follows in 2–3 business days.
What if I don't have drawings?
Send photos, sketches or a dimension list. We will tell you what else we need.

Ready to send your drawings?

Price range in 24 hours. Firm quote in 2–3 business days.

Upload drawings
Steel Fabrication & Pre-Engineered Steel Buildings from Turkey